top of page

How Has the London Bridge Project Helped Improve Massmelt's Engineering?

Nov 7
5 min read

The London Bridge project has helped improve Massmelt through real operating experience, additional engineering development and a detailed review with railway engineering executives.


Following an incident, we introduced further design features addressing the challenges associated with pressurised canisters, explosive gases and lithium-battery thermal events.


The revised machine has received approval from the engineering executives involved in the project, and preparations are underway for recommissioning.


It is an example of how operating experience can help us develop better equipment.


Key Takeaways


  • Massmelt demonstrated a further 83.3% volume reduction during its original London Bridge trial.

  • An incident during the project led to approximately a year of additional engineering work.

  • The revised design includes features addressing challenges involving pressurised canisters, explosive gases and lithium-battery thermal events.

  • Railway engineering executives have reviewed and approved the revised machine, according to the latest project update.

  • The next stage is recommissioning and assessing the improvements during routine operation.


What Did Massmelt Demonstrate at London Bridge Station?


London Bridge Station handles large numbers of passengers, retail activity and the mixed materials generated throughout the day.


That creates pressure on collection areas, storage space and vehicle movements.


The station already had a conventional rotary compactor. We wanted to establish whether Massmelt could reduce the volume further.


The original trial produced a measurable result.


A quantity of 0.942m³ of mixed station material, already processed through the rotary compactor, was reduced to 0.157m³ using Massmelt.


That represented a further 83.3% reduction in volume.


The result was particularly useful because the material had already been compacted.


Massmelt demonstrated that additional volume reduction was possible, even after the existing equipment had done its work.


That provided a strong starting point for the project. The next challenge came from operating the equipment in a live railway environment.


Why Did the London Bridge Project Lead to Further Engineering Work?


A machine can perform well during a trial and still provide opportunities for improvement once it is operating on site.


London Bridge is a demanding environment. Material arrives from different activities, often through shared collection arrangements.


Massmelt is designed to process suitable mixed, compressible material.


Unlike Sterimelt, which works with a homogeneous polypropylene stream, Massmelt handles a heterogeneous mixture. This makes understanding the incoming material particularly important.


During the London Bridge project, an incident occurred.


It led to an extended engineering review and gave us the opportunity to develop additional features for the machine.


We have spent approximately a year working with railway engineering executives on the revised design.


The important outcome is what that experience has allowed us to improve.


Rather than relying only on the results of the original compaction trial, the project has contributed directly to further engineering development.


What Engineering Improvements Have Been Made to Massmelt?


The additional work has focused on challenges that can arise when unexpected items enter mixed-material collection streams.


In particular, we have introduced features addressing the potential ingress of pressurised canisters and the behaviour of explosive gases and lithium-battery thermal events.


These changes form part of the revised Massmelt design developed through the London Bridge project.


They demonstrate why practical operating experience is valuable.


A machine working in a transport hub has to fit the material collection arrangements, the available space and the demands of the site.


Massmelt uses mechanical pressure and controlled heat to consolidate suitable compressible material into dense logs.


The development work has considered how that process should be supported by additional protective engineering features.


The machine's approved material requirements remain important. Pressurised canisters and lithium batteries are excluded from the intended feedstock.


The new features address conditions considered during the engineering review and complement the site's established operating arrangements.


For us, the purpose of the work is to make the machine better suited to the environment in which it is used.


What Has the Railway Engineering Review Achieved?


The project has involved railway engineering executives with experience of the technical challenges associated with train accidents.


Their involvement has brought an additional level of engineering scrutiny to the revised machine.


Following approximately a year of work, the latest project update confirms that the engineering executives involved have approved the machine ahead of recommissioning.


That is a significant step in the project. The work has progressed from an initial demonstration of volume reduction to a revised machine incorporating further engineering developments.


Six-stage London Bridge project timeline covering the initial Massmelt trial, operating experience, engineering review, machine improvements, approval and planned recommissioning.

The approval is an important project milestone. Once the machine is back in service, its ongoing performance can be assessed under normal station conditions.


Why Does This Matter for Other Transport Hubs and Commercial Sites?


Railway stations are one example of where mixed, compressible material creates operational pressure.


Airports, shopping centres, stadiums and large retail facilities have similar challenges.


Material accumulates throughout the day. Collection areas have limited space, and vehicles need access at particular times.


Massmelt is designed to reduce the volume of suitable material before collection.


The London Bridge experience demonstrates two things.


First, there can be considerable potential for additional volume reduction beyond conventional compaction.


Second, equipment can be improved through the experience gained from real installations.


These lessons are relevant to other high-footfall locations, although each site will have its own collection arrangements and material composition.


The machine and its application should therefore be considered together.


How Could Massmelt Help Reduce Collection Costs and Scope 3 Emissions?


Reducing the volume of mixed material can make a practical difference to collection requirements.


A smaller volume may allow the same quantity of material to be transported using fewer vehicle movements, depending on the site's arrangements.


That can reduce loading-area pressure, collection costs and transport-related emissions.


For London Bridge, the original trial measured an 83.3% additional volume reduction.


In terms of occupied volume, the processed material required approximately one-sixth of the space it occupied before Massmelt.


This provides a useful basis for considering transport efficiency.


The actual savings depend on collection frequency, material quantities, vehicle capacity and the way the site operates.


Where fewer third-party collections result, there may also be a reduction in relevant Scope 3 transport emissions.


These outcomes can be assessed using operating and collection records after recommissioning.


The commercial value of a machine is ultimately determined by what changes for the organisation using it.


What Does the London Bridge Project Mean for Massmelt's Next Stage?


The next step is to recommission the revised Massmelt machine at London Bridge.


The project has already demonstrated substantial additional volume reduction. It has also provided operating experience that has led to further engineering improvements.


Both are important. We design equipment to solve practical problems. That means understanding what happens to material on site, how the machinery performs and where further improvements can be made.


The engineering work at London Bridge has taken approximately a year, involved experienced railway specialists and resulted in approval for the revised machine from the executives involved.


Recommissioning will provide the opportunity to assess those developments during normal operation.


For us, the value of the project is in the engineering progress it has produced and the opportunity to apply that experience to future installations.


Book a meeting with Sterimelt to discuss how Massmelt could reduce mixed-material volume, collection requirements and transport pressure at your site.


FAQs


What did Massmelt achieve during the London Bridge trial?


The original trial reduced 0.942m³ of previously compacted mixed station material to 0.157m³, representing a further 83.3% reduction in volume.


Why was the Massmelt machine modified after the trial?


An incident during the London Bridge project led to additional engineering work and a review of the machine's design.


What improvements have been introduced to Massmelt?


The revised design includes additional features addressing challenges associated with pressurised canisters, explosive gases and lithium-battery thermal events.


Who reviewed the Massmelt engineering improvements?


Railway engineering executives with experience of train accident engineering have been involved in the review over approximately a year.


Has the revised Massmelt machine been approved?


According to the latest project update, the engineering executives involved have approved the revised machine ahead of its planned recommissioning.


Has Massmelt returned to operation at London Bridge?


Recommissioning is planned following the engineering work. Its current operational status should be confirmed before publication.


Can Massmelt help reduce transport-related emissions?


Potentially. Processing suitable mixed material into a smaller volume may reduce collection journeys and associated transport emissions, depending on the site's operating arrangements.


 
 
 

Comments


ABOUT US 

Sustainable Recycling. Engineered to Endure.

​

Sterimelt Technologies provides patented, innovative, point-of-origin solutions that convert plastic waste into reusable materials. Originally developed for challenging waste streams like fish boxes, our technology has proven its durability and effectiveness—some of our first machines are still in use today. Our philosophy is simple: we build machines that last, or we don't build them at all. This commitment is captured in our motto: "No Cost Saving – No Sustainability." Choose the lasting solution for a greener future.

​​

​

Image Disclaimer: Certain images on this website are illustrative renders and may differ from the final manufactured equipment. Product specifications, configurations, and features are subject to change.

 

© 2025 Sterimelt Technologies LTD. All rights reserved.

​

  • Facebook
  • LinkedIn
bottom of page